21 Broadway Lofts

21 Broadway Lofts

21 Broadway Lofts The seven-story brick building was originally constructed in 1913 for commercial use. In 2007 the building was rezoned from a commercial to residential building, resulting in upgrades to the building to meet residential zoning requirements. EPS15...
TRAX Lightrail Project

TRAX Lightrail Project

TRAX Lightrail Project The Utah Transit Authority (UTA) construction of the $250 million TRAX West Valley Lightrail line presented a challenge because it required embankments up to 40 feet high on existing poor soil conditions. The problem was caused by the Lake...
Megaplex 20 Theater

Megaplex 20 Theater

Megaplex 20 Theater When designing the large Megaplex theater,  Geofoam was selected as a lightweight void fill for the stadium seating.  The entire theater features a total of 5,594 seats, with the largest auditorium seating 590 people. 340,00 cubic feet of EPS15...
Harkins Theater

Harkins Theater

Harkins Theater The construction of the Harkins 18-Plex Theatre required a material that would be quick and easy to install in addition to being less expensive than traditional steel framing used in similar stadium seating applications. Geofoam was selected for the...